CIP & Construction
Current Projects
Curb & Gutter Drainage Improvement Project
Goals:
- To construct curb & gutter and driveway entrances at various locations throughout the City of Roanoke to intercept stormwater and alleviate flooding
- Expand the City's network of curb & gutter coverage
- Improve roadway uniformity and appearance
- Locations include installations in the vicinity of:
- 2700 Block of Hollowell Ave SW
- Mountain Ave SE & Highland Ave SE
- 1700 Block of Blair Rd SE
- Woods End Ln
- 22nd St NW & Staunton Ave NW
- Barnett Rd NW & Northwood Dr NW
- Essex Ave NW & 17th St NW
- Cumberland St NW & Greenland Ave NW
- Nancy Dr NW & Cherryhill Rd NW
- 1700 Block of Coveland Dr NW
- 11th St SW & Patterson Ave SW
Estimated Timeline: October 2023 - April 2024
Residents can expect some disturbances during construction M-F, 7:00am - 7:00pm, check our Facebook or Nextdoor for current updates.
Victoria St NW Stormwater Drainage Improvement Project
Goals:
- Alleviate localized flooding by constructing new stormwater drainage infrastructure and roll-top curb & gutter
- Provide roadway improvements by widening lower portion of Victoria St NW to better match width of upper portion
- Click here to see project map.
Estimated Timeline: December 2023 - May 2024
Residents can expect some disturbances during construction M-F, 7:00am - 7:00pm, check our Facebook or Nextdoor for current updates.
Cove and Delaware Stormwater Drainage Improvement Project
Goals:
- Alleviate localized street and property flooding by constructing new stormwater drainage infrastructure and curb & gutter
- Improve pedestrian accessibility by installing sidewalk and improved pedestrian ramps
- Click here to see project map.
Estimated Timeline: November 2023 - July 2024
Residents can expect disturbances during construction. Call 540-853-5900 for any concerns. You can also check our Facebook or Nextdoor for current updates.
1600 Block 24th St Stormwater Drainage Improvement Project
Goals:
- Minimize roadway water ponding by replacing the existing asphalt roadway with a permeable concrete roadway surface that will absorb stormwater.
- Improve overall site drainage by installing stormwater infiltration areas adjacent to the road.
- Create water quality benefits by filtering stormwater through stone reservoirs before it enters local streams.
- Provide valuable performance data that will assist in future City of Roanoke permeable pavement projects.
- Click here to see project map.
Estimated Timeline: September 2023 - January 2024
Residents can expect disturbances during construction. Call 540-853-5900 for any concerns. You can also check our Facebook or Nextdoor for current updates.
Patterson Ave/Chapman Ave Drainage and Street Improvements
This is a collaborative project between the City of Roanoke's Stormwater Utility and Engineering Division.
Goals:
- Alleviate localized flooding by constructing new stormwater drainage infrastructure and curb & gutter
- Improve pedestrian accessibility by installing sidewalk and improved pedestrian ramps
- Connect the Hurt Park and Mountain View Neighborhoods to the Roanoke River Greenway by installing new sidewalk
- Improve vehicular functionality by installing new asphalt and making intersection improvements at Patterson Ave and Boulevard St
- Click here to see project map.
Estimated Timeline: February 2023 - November 2024
Residents can expect some disturbances during construction M-F, 7:00am - 7:00pm, check our Facebook or Nextdoor for current updates.
Sunrise Ave./ Oakland Blvd. NW
Goals:
- Repair and improve stormwater drainage and install curbing/gutters.
- Upon completion of the project, roadway and yard flooding in these areas will be minimized.
- Completion of the project will also include new concrete sidewalk, new concrete curbing, new access ramps, and repaving the roads where applicable
- Click here to see project map.
Estimated Timeline: September 2022 - September 2023
Residents can expect some disturbances during construction M-F, 7:00am - 7:00pm, check our Facebook or Nextdoor for current updates.
Recently Completed:
From July 2020 to October 2023, several stormwater projects were constructed which include the following:
- Sunrise Ave/Oakland Blvd
- Sample Ave/Crown Point Rd
- Sweetbrier Ave
- Lakecrest/Greenlee Rd
- 1400-1600 Blk Templeton Ave
- 3500 Blk Windsor Rd
- Deyerle Rd
- Glenoak/Ivywood St
Upcoming Projects:
Presently, the following projects are under various stages of design:
- Narrows Ln
- Downtown Jefferson St
- Salem and 1st St
- Harvest Ln
- Melrose Ave Crossing
Project Sustainability
What is Envision?
Envision is a rating system and planning guide used by the City of Roanoke to assess and improve our infrastructure projects. The rating system promotes sustainability in five key categories: Quality of Life, Leadership, Resources Allocation, Natural World, and Climate and Risk. The overall goal with incorporating Envision concepts into drainage projects is to ensure that the City of Roanoke is not only doing the project right, but the right project. A project that would address the needs and goals of the community across all areas.
Learn more about benchmarking Stormwater CIP projects with Envision in the City of Roanoke